top of page
SR A1A / SR 934 / SR 5 (US-1) / SR 7
- SR A1A INDIAN CREEK DRIVE FROM ABBOTT AVENUE TO SR 907/W 63RD STREET
- SR 934 NW 79TH STREET FROM E 4TH AVENUE TO 12TH AVENUE
- SR 5 (US-1) FROM NE 22ND STREET TO SANS SOUCI BOULEVARD
- SR 7 FROM NW 63RD STREET TI NW 215TH STREET
CEI - Construction Engineering Inspection
SCOPE OF WORK
Four projects running consecutively consisting of upgrading the signalization system throughout the project corridor, reconstruction of intersection & median ramps, drainage improvements, widening, milling and resurfacing, signing, and lighting upgrades along seven different corridors.
As the Project Administrator Castillo Engineering administered the construction contract, ensured compliance with specifications, certification packages (including materials), and final as-built plans, performed schedule reviews, maintained a constant line of communication with FDOT officials, designers, stakeholders, utility owners, and respective agencies, managed inspection staff, coordinated all work with the contractors.
CLIENT
Florida Department of Transportation (District 6)
LOCATION
Miami, Florida
PROJECT COST
$5.3 Million*
*Combined
bottom of page